A few years ago I obtained a set of three documents detailing the commissioning of Rugby PSB in September 1964. Here they are: they make interesting reading - especially the arrangements during changeover for running trains through Rubgy using handsignalmen and absolute block worked by telephone. Stage 1 12-14 September 1964 page 1 title page page 2 preamble page 3 page 4 implementation instructions - index page 5 page 6 Appendix A - possessions page 7 page 8 page 9 Appendix B - signalling prior to changeover page 10 page 11 Appendix C - method of working during changeover page 12 page 13 page 14 Appendix D - instructions to handsignalmen and pointminders page 15 page 16 page 17 page 18 page 19 page 20 Appendix E - instructions to signalmen page 21 Appendix F - schedule of staff to be provided by the district engineer page 22 page 23 Appendix G - removal of redundant signal structures page 24 Appendix H - divisional manager's operating supervision page 25 Appendix J - up line occupation page 26 Appendix J - down line occupation page 27 Appendix K - signal engineer's test trains page 28 page 29 special instructions to driver page 30 special instructions to guard Stage 2 20 September 1964 page 1 title page page 2 preamble page 3 page 4 Appendix A - preparatory work and disconnections page 5 Appendix B - schedule of staff to be provided page 6 Appendix C - divisional manager's operating supervision Stage 3 26-28 September 1964 page 1 title page page 2 preamble page 3 implementation instructions page 4 page 5 Appendix A - possessions page 6 Appendix B - signalling prior to changeover page 7 Appendix C - method of working during changeover page 8 Appendix D - instructions to handsignalmen and pointminders page 9 page 10 page 11 page 12 page 13 Appendix E - instructions to signalmen page 14 Appendix F - schedule of staff to be provided page 15 Appendix G - removal of redundant signal structures page 16 Appendix H - divisional manager's operating supervision page 17 Appendix J - up line occupation page 18 page 19 Appendix J - down line occupation page 20 page 21 page 22 page 23 Appendix K - schedule of signal engineer's test trains page 24 page 25 Special instructions to driver page 26 Special instructions to guard
|
|